Pipe rack platform Kocaeli - TR
PROJECT
A pipe rack platform was built for the construction expansion of the Tüpraş Refinery. This 750 m long platform at a height serves as the base for installing pipe structures and welding, insulation paint and test work.
- Location: Kocaeli, Turkey
- Customer: Gemont, commissioned by Tüpras
PROJECT REQUIREMENTS
- Scaffolding design for temporary construction
- Quick and easy set up and dismantling
- Scaffolding materials that can withstand heavy loads
- Material shipment in accordance with the assembly phases
- Project follow-up
CUSTOMER REVIEW
AFIX TR has been our partner in system scaffolding solutions many times. These complex suspended installations require reliable system scaffolding that can carry heavy loads. AFIX TR only supplies scaffolding components that comply with EN 12810/12811 and took the strict safety standards into account at all times during the construction phase. We saved a lot of time and money because site safety was always guaranteed.
LINKED SOLUTIONS
LINKED SERVICES