Belgium National Courthouse Brussels - BE

PROJECT 

The first phase of the restoration works at the National Palace of Justice in Brussels (BE) were launched in mid-October 2023. In collaboration with Régie des Bâtiments, SPF Justice, Urban.brussels, Perspectiv architects, Artes Woudenberg started this project is due to be completed in 2030.

Location: Brussels city centre
Client: Buildings Agency, FPS Justice
In collaboration with:

  • Artes Woudenberg - external restoration of roof structures, facades and external carpentry
  • Beltek - assembly of Afix Fast system scaffolding

20,000 m³ AFIX FAST SYSTEMS SYSTEMS

After engineering and static load calculations by Afix Group, Scaffolder Beltek from Dilbeek processed around 220 tonnes of multi-rectional scaffolding into birdcagescaffolding, façade and span structures. Artes Woudenberg deployed an extensive team of specialists to perform various tasks on the more than 140-year-old building:

  • thorough cleaning and restoration of natural stone facade
  • total restoration of the carpentry, stripping of wood and metal
  • fitting new glazing and improving airtightness
  • restoration of the iconic figurative leaded ridges and roof elements on the front façade
  • restoration of natural stone floors for original luster scaffolding around the dome base in function of subsequent restoration phases



SCAFFOLDING FREE IN 2030

In mid-October 2023, the restoration of the facades of the Brussels Law Courts started. The building restoration covers more than 150,000 m² of natural stone surface. In several phases, the facades on the De Wynantsstraat, Wolstraat and Minimenstraat sides, as well as the facades on the courtyards and ramps, will be tackled. The aim is to make the Courthouse scaffold-free by 2030. In total, this project was budgeted at €31.7m.

PROJECT REQUIREMENTS

To facilitate the restoration works at height, assembly of birdcage scaffolding with working platforms at each level is necessary. Safe access to these working levels is to be provided by stair towers.

  • delivery, assembly/dismantling and inspection of birdcage scaffolding, facade scaffolding and stair towers
  • provide loading and height platforms for execution of work close to facades and roof structures
  • lightweight tower staircases for passenger access with the exit possibility at various heights

CUSTOMER'S OPINION

To restore the Courthouse to its historical grandeur, first of all the natural stone façade will be thoroughly cleaned and restored. This involves removing dirt and grime and then repairing the carpentry: damaged wooden elements are restored and new glazing is inserted to improve insulation and safety. Safety when carrying out these works at height is a priority. In addition, the productivity of our teams is also key. Afix Fast is a multidirectional scaffolding system that is easy to (dis)assemble and also provides our employees on the work platforms with the safety they need to carry out the restorations professionally.

Read more about Poncad Software

LINKED SOLUTIONS

LINKED SERVICES

You want more information about
our products or services?

Your registration has been received.

We will contact you as soon as possible.

Fill in your details and we will contact you as soon as possible!

Please select an option
This field is mandatory
This field is mandatory
Please select a country
Please provide a valid e-mail address
Please accept the conditions

Gelieve onderstaande velden correct in te vullen.

  • {{validation.errorMessage}}