ACCESS TOWERS FOR INDUSTRIAL SHUTDOWNS Rotterdam - NL
PROJECT
Afix NL has been supplying scaffolding material to Biopetrol Rotterdam B.V. and Ducor Petrochemicals B.V. for a number of years. During production shutdowns, inspection work is carried out using temporary access towers.
- Location: Botlek area, Rotterdam
- Customer: Van Staveren B.V. Industrial Insulation
PROJECT REQUIREMENTS
- Complete package of all scaffolding components
- Combination of metric and non-metric dimensions
- Scaffolding configurations with scaffolding wood or steel decks must be possible
CUSTOMER REVIEW
AFIX NL is a supplier that responds quickly and can deliver within 48 hours.
We buy our system scaffolding from Afix and absorb temporary peaks through scaffolding rental.
For the entire project we remain loyal to a single scaffolding supplier who can offer compatibility in metric and non-metric dimensions. In addition, we have the option of switching from rental to purchase at any time. So it really is a flexible partner.
LINKED SOLUTIONS